Operation and maintenance of the sewage system
Sewer system maintenance operation
Maintenance work on the sewage system
Replacement and renovation process of the chlorine storage facility at the Al-Rumaili wastewater treatment plant
Maintenance and calibration process of the discharge line of the sediment removal pumps in Fuwa
Hydraulic analysis software supply process
Replacement and renewal of drinking water and sewage networks
Construction of a covered drainage network in the Aziyat al-Bab area
Maintenance process for open drainage systems in Abu Kabir drainage engineering.
Maintenance work on open drainage systems for the West Faqous drainage engineering projects