The process of re-installing and balancing the air intakes of the Aslouji sewage pumping station
Supply process for accredited laboratories for ISO certification
Supply of operating and control screens for diesel generators at power stations
Supply process of a complete surveying station
Supply and installation of water level measuring devices for water intakes
Supply process of pipes, special fittings and building materials
Replacement and renovation process of the Kafr Shalshalamoun wastewater treatment plant
Repair process for subsidence and breaks in drainage lines
Supply of raw materials for meter installation
Replacement and renewal of booster pumps and semi-autogenous injection systems