Heavy equipment rental process - Al Buhayrah
Manufacturing or supplying a 45-ton hook winch
Forklift supply process
Supply process of a wheeled articulated loader
Supply, installation and repair of a Kapiller loader
Doosan loader supply, installation and repair process
Supply of 1 dust-collecting machine
Supply of an external crane for the Tanta University Press
Supply of one (1) quay crane with a capacity of 65/75 tons for the Alexandria Container Terminal
Supply of (2) forklifts with a minimum lifting capacity of (16) tons for the Alexandria and Dekheila stations.