May 29, 2026
Preparing an environmental and technical study for high-voltage power lines

Preparing an environmental and technical study for high-voltage power lines

June 7, 2026
Egypt
The process of re-installing and balancing the air intakes of the Aslouji sewage pumping station

The process of re-installing and balancing the air intakes of the Aslouji sewage pumping station

June 7, 2026
Egypt
Replacement and renovation of the new Corniche cranes

Replacement and renovation of the new Corniche cranes

June 7, 2026
Egypt
Fire system for Al-Muwaysat wastewater treatment plant

Fire system for Al-Muwaysat wastewater treatment plant

June 9, 2026
Egypt
Fire system for Al-Mahamid sewage treatment plant

Fire system for Al-Mahamid sewage treatment plant

June 10, 2026
Egypt
Replacement and renewal of turbine pumps at South El Alamein power station

Replacement and renewal of turbine pumps at South El Alamein power station

June 2, 2026
Egypt
Replacement and renovation of the old drinking water filtration plant

Replacement and renovation of the old drinking water filtration plant

June 29, 2026
Egypt
Supply process of a heat treatment furnace with a chamber

Supply process of a heat treatment furnace with a chamber

أمر مباشر
Egypt
Power Factor Correction Panel Supply and Installation Process

Power Factor Correction Panel Supply and Installation Process

May 17, 2026
Egypt
Supply and installation process of the power factor correction panel for the Fuwa station

Supply and installation process of the power factor correction panel for the Fuwa station

May 19, 2026
Egypt